Fit out costs and who pays for what is entirely negotiable
Updated: Sep 4
Introduction
A tenant takes an empty unit and spends a substantial sum making it usable: partitions, flooring, lighting, power, a kitchen and a reception area. All of it is paid for by the tenant, because nobody suggested any alternative.
Down the corridor, another tenant negotiated a landlord contribution towards the same kind of work, a longer rent free period to cover the disruption, and an agreement that the fit-out need not be removed at the end. Both tenants paid the same rent. One asked and one did not. Nothing else about the two transactions was different.
1. Fit out costs and who pays for what is a negotiation, not a convention
Start from that position.
Landlord contributions, works carried out by the landlord, and extended rent free periods are all normal parts of a letting. What each party pays for is settled in the negotiation and nowhere else. Nothing about the division of cost is set by convention or by the market.
2. Establish exactly what condition the premises are being handed over in
The baseline for everything.
Whether there is flooring, lighting, heating, power distribution, partitioning and facilities. Understanding precisely what is and is not there is what allows you to cost the work at all.
3. Cost the fit-out before agreeing the rent
Sequence determines leverage.
A quotation for the work in hand, before terms are settled, tells you what the premises really cost. Tenants who agree a rent and then discover the fit-out cost have lost the ability to negotiate on it. The number to establish first is the total, not the rent.
4. Ask for a contribution or works from the landlord
Frequently available.
A capital contribution, the landlord carrying out specified works, or a longer rent free period in lieu. Which suits you depends on cash flow, and all three are ordinary requests.
5. Agree what happens to the fit-out at the end
The item that costs the most later.
Whether you must remove it and reinstate the premises, or whether it can remain. A written agreement that reinstatement is not required can be worth a great deal at lease end, and it is easy to obtain at the outset. At the end of the term it cannot be obtained at all.
6. Get landlord consent for alterations in writing
A lease requirement almost always.
Most leases require consent for alterations, frequently through a formal licence. Carrying out work without it is a breach and can complicate the position at lease end considerably.
7. Check who owns the improvements
Not always obvious.
Fixtures attached to the building may become the landlord's property. This affects insurance, depreciation and what you can remove, and it is worth establishing rather than assuming.
8. Insure the fit-out properly
Frequently missed.
Tenant's improvements are not covered by the landlord's building insurance and need to be included in your own. Businesses discover this after a fire, having insured stock and equipment but not the premises they paid to fit out.
9. Watch how it interacts with rent review
A real financial consequence.
Review clauses should disregard tenant improvements, or you pay increased rent based on the value of work you funded. Confirm this is in the lease rather than assuming it.
Budget for the fit-out taking longer and costing more than quoted, because it usually does, and for the period of reduced trading while it happens. That total, rather than the construction quotation, is the real cost of taking the premises.
Conclusion
Treat it as a negotiation rather than an assumption about who pays.
Establish precisely what condition the premises are handed over in, obtain fit-out costs before agreeing the rent, ask for a contribution, landlord works or an extended rent free period, agree in writing whether reinstatement will be required at the end, obtain formal consent for alterations, establish who owns the improvements, insure tenant's improvements under your own policy, confirm they are disregarded at rent review, and budget for overruns and lost trading.